Smithsonian south portico repaving project

  • Duration: 6 months

  • Location: Washington, DC

  • Owner: Smithsonian Institution

  • Award: $221,299

HSU was the prime contractor on this project to remove existing sandstone pavers, ADA ramp, provide new sealed granite pavers, new granite ADA ramp on new setting bed, and new sandstone column bases.

The project included extending the new handrail and modifying the existing electrical and plumbing fixtures. HSU relocated and reconnected the kitchen equipment.