• Duration: 3 months
  • Location: 7303 River Road, Bethesda, MD
  • Architects: Steven Kahle Architects
  • Size: 10,000 sf

View Holton-Arms School under the following projects:

The girls of the prestigious Holton-Arms School were treated to a big surprise upon returning from summer break – a gorgeous new dining room and servery, and a state-of-the-art kitchen. Thanks to the tremendous efforts of HSU, the major renovation was performed completely over the few months of summer vacation and required crews to work round-the-clock for weeks on end to meet this daunting deadline. However, the school was still open during construction and HSU provided alternative traffic lanes and administered the highest level of safety to protect staff, students, and visitors who were still using the facility during construction.

The dark and dated space was transformed into an open, bright, and artistic multi-purpose area and is now flooded with natural and energy-saving lighting. Other features include specialty ceilings, modern A/V systems, custom patterned tile, and the use of renewable resources such as bamboo wall treatments. HSU also performed a complete overhaul of the historic entry area including a new glass entryway, new stairs with custom railings, and new administrative offices. HSU is proud to have completed this spectacular project, especially under such a critical schedule. The efforts have not gone unnoticed; the Owner, students, and parents are thrilled with the new space and HSU was honored with an Award of Excellence at the 2012 Washington Contractor Award gala for this project.



View Projects By Category